Server Virtualization
Collapse a room of ageing servers into one cluster on VMware, Proxmox, Nutanix or Hyper-V, so one dead host no longer stops the business.

What we usually find on site
Most server rooms we walk into still run one box per application: one for accounting, one for ERP, one as the file server. They are 6–8 years old, out of warranty and have no standby. When a power supply dies, accounting can be down for days while the part comes from Thailand. Organizations already on VMware have a different headache: the new subscription pricing after Broadcom bought the company.
Two or three hosts instead of eight or ten
Virtualization lets 2–3 physical hosts run dozens of virtual machines (VMs). Less hardware, less power, a smaller UPS. When firmware needs updating, VMs live-migrate to another host first and users never notice.
Choosing a hypervisor without taking sides
Since Broadcom bought VMware, perpetual licences are gone. What remains is per-core subscription with a minimum core count per CPU, and for small clusters the bill can be much higher than expected.
| Platform | Who it suits |
|---|---|
| VMware vSphere | Teams already built around VMware tooling that can absorb the new cost |
| Proxmox VE | Open source (KVM), with optional paid support subscriptions |
| Nutanix AHV | Paired with Nutanix HCI, simple to run |
| Microsoft Hyper-V | Included with Windows Server Datacenter; natural for all-Microsoft shops |
Our view: for an SME with fewer than 20 VMs and no VMware history, Proxmox VE with a support subscription is usually the best value. If your IT team is Windows through and through, Hyper-V is a sound choice.
What Lao sites need
Power cuts are a question of when, not if. We configure the UPS to shut VMs and hosts down in order before the battery runs out, and to bring them back when power returns. VM backups go to a separate location, never the same storage.
Send us a list of your current servers and applications and we will propose a cluster size and a side-by-side hypervisor comparison.
What it does
High availability
If a host fails, its VMs restart on the surviving hosts within minutes.
Live migration
Move running VMs off a host to patch firmware or add RAM during office hours.
VMware exit path
Assess and move to Proxmox VE, Nutanix AHV or Hyper-V, testing each VM before cut-over.
Snapshots & templates
Build new servers from templates in minutes; snapshot before each change and delete it once the change is proven.
UPS-integrated shutdown
VMs first, then hosts and storage, before the UPS battery runs flat, so databases are not corrupted.
VLAN-segmented networking
Management, storage, migration and user traffic on separate VLANs, with management unreachable from ordinary users.
Design and rollout
- 1
Inventory existing servers and workloads: real CPU, RAM, IOPS and Windows/SQL licensing.
- 2
Select the hypervisor and size for N+1: lose one host and the rest still carry the full load.
- 3
Install hosts, shared storage or HCI, and a redundant pair of 10/25GbE switches.
- 4
Migrate (P2V/V2V) in waves out of hours, with users signing off each application.
- 5
Configure backup, UPS shutdown and monitoring, pull the plug for a real test, then hand over documentation.
Where it fits
- A mining head office consolidating ERP, accounting and file servers into one cluster.
- A bank or microfinance institution separating production, test and DR VMs.
- A hotel running PMS, POS and CCTV VMS on the same pair of hosts.
- Organizations leaving VMware because of the new subscription pricing.
Typical system sizes
SME
Fits: 5–15 VMs, single site
- 2 hosts with shared storage or replication, plus a witness/QDevice
- Proxmox VE or Hyper-V
- UPS integration and basic backup
Business
Fits: 15–60 VMs requiring HA
- 3-host cluster with HA and live migration
- Redundant 10/25GbE switch pair
- Migration from legacy servers
Enterprise
Fits: 60+ VMs, multiple sites
- Primary cluster plus replicated DR site
- VMware exit assessment and migration
- Maintenance and monitoring contract
Brands we supply & install
All brand names and trademarks belong to their respective owners. Mention does not imply official partnership unless explicitly stated. Products are sourced through legitimate distribution channels.
FAQ
Should we move off VMware?
There is no single answer. We put your new VMware quote next to Proxmox, Nutanix and Hyper-V, including migration effort and retraining. For some it is cheaper to stay; for others it is not.
Is Proxmox ready for business use?
Yes. Proxmox VE runs on KVM, the standard Linux hypervisor, and supports clustering, HA and Ceph. For production we recommend a subscription for the tested enterprise repository and vendor support.
How many hosts do we need?
Real HA needs 3 hosts, or 2 plus a witness (a QDevice in Proxmox) so the cluster keeps quorum when one fails. Two hosts with no witness is not enough.
Does virtualization replace backup?
No. Snapshots live on the same storage and HA only restarts VMs. Lose the storage or get hit by ransomware and everything goes together. You still need separate 3-2-1 backups.
Related guides
After Broadcom Bought VMware: Renew, or Move to Proxmox VE, Nutanix, Hyper-V or XCP-ng?
What changed in VMware licensing since 2023, an even-handed look at the alternatives, and an evaluation and migration process that keeps risk under control.
Server Room Checklist for a Hot, Humid Climate: Power, Cooling, Security and Cabling
The checklist we actually use when building or fixing server rooms in Laos: brownouts, failed AC, flooding, dust, and the documentation nobody writes.
The 3-2-1 Backup Rule (and 3-2-1-1-0) in Practice
The backup rule used worldwide, why ransomware added the extra "1" and "0", how to set RPO and RTO, a worked restore-time example, and how to make it work with Lao power…
NAS, SAN or Cloud: Where to Keep Company Data When the Internet Isn't Always Fast
How NAS, SAN and cloud differ on protocols, performance and cost, with real upload-time maths and a hybrid design that suits Lao internet links.
Related solutions
Data Center & Servers
Send us a floor plan or a few photos of the site
We’ll come back with a few questions, then a first design. The first consultation is free, in Lao, Thai or English, on WhatsApp or our Facebook page.