Cloud Migration
Decide what belongs in the cloud and what should stay, then move in stages with your internet link and monthly bill in mind.

What we usually find on site
The office servers are old and nearly out of warranty. Some vendors say to move everything to the cloud. Do that without a plan and the monthly bill can surprise you, and the ERP slows down every time the building's internet wobbles. What you need is advice from someone not selling just one answer.
Not everything belongs in the cloud
We go system by system using the 6R framework (Rehost, Replatform, Refactor, Repurchase, Retain, Retire). In practice, email and documents almost always suit SaaS. An ERP hammered all day by office staff, or a CCTV VMS writing several TB a week, usually belongs on-premises or hybrid.
Lao realities
- Connectivity: cloud-hosted critical systems need two ISPs on physically different routes, with SD-WAN or failover. If both fibres enter the building through the same trench, one excavator cuts them both
- Latency: choose a nearby region such as Singapore, or Bangkok where the provider has one
- Cost: model egress, storage and always-on VMs explicitly. A VM running 24/7 for three years can cost more than buying the server
- Sector rules: some sectors, banking for example, have internal policies on where data may sit; check them first
Low-risk sequencing
Start with low-risk workloads, test, then move critical systems with a rollback plan at every step. Afterwards we set budget alerts and right-size VMs monthly so costs don't creep up.
Send us your list of systems and your current internet speeds, and we will tell you what to move first and what to leave alone.
What it does
6R assessment
Decide per workload whether to move, modernize, replace or keep.
Cost modelling
Compare 3–5 year TCO for on-premises versus cloud.
Hybrid design
Connect offices to cloud through site-to-site VPN or SD-WAN.
Migration with rollback
Every wave has a tested way back if something goes wrong.
Cloud security baseline
IAM, MFA, network security groups and logging.
Post-migration cost control
Budget alerts, right-sizing and monthly reporting.
Design and rollout
- 1
Discover systems, dependencies and internet bandwidth.
- 2
Classify by 6R and model TCO.
- 3
Design the landing zone: accounts, networking, security and backup.
- 4
Migrate in waves with testing and rollback plans.
- 5
Tune performance and cost on an ongoing basis.
Where it fits
- Companies moving an old file server to SharePoint or Google Drive.
- Websites and customer apps that must be reachable globally.
- Logistics firms sharing systems between Laos and Thailand.
- Organizations using cloud as a DR site instead of a second server room.
Typical system sizes
Assessment
Fits: Organizations still deciding
- Discovery and 6R classification
- TCO comparison
- Roadmap and report
Migration
Fits: 5–30 servers
- Landing zone and hybrid connectivity
- Wave migration with rollback
- Backup and monitoring
Managed Cloud
Fits: After migration
- Monthly operations and patching
- Cost reporting and right-sizing
- Security reviews
Brands we supply & install
All brand names and trademarks belong to their respective owners. Mention does not imply official partnership unless explicitly stated. Products are sourced through legitimate distribution channels.
FAQ
Is cloud cheaper than on-premises servers?
Not always. Cloud removes hardware spend, but always-on VMs can cost more over 3–5 years. SaaS such as email usually pays off; large VMs running 24/7 need careful sums.
What happens if our internet goes down?
Cloud-hosted systems become unreachable from the office. That is why we recommend two ISPs (or fibre plus 4G/5G backup) and keeping some systems on-premises.
Which cloud provider should we use?
It depends on your existing systems and skills. Microsoft shops often lean towards Azure, but we compare options first, including which region is closest to Laos.
Related guides
NAS, SAN or Cloud: Where to Keep Company Data When the Internet Isn't Always Fast
How NAS, SAN and cloud differ on protocols, performance and cost, with real upload-time maths and a hybrid design that suits Lao internet links.
Internet Redundancy with Dual ISPs: When the Fiber Gets Cut
Failover or load balancing, how to pick two providers that won't fail together, the equipment you need, and how to test failover so you know it really works.
IT Budget Planning for SMEs: Stop Buying When Things Break, Start Ranking by Risk
Asset inventory, replacement cycles, CapEx versus OpEx, exchange-rate risk and a sample 3-year plan for a 50-person company in Laos.
Microsoft 365 or Google Workspace: How Does Your Organisation Actually Work?
Email, documents, collaboration, security and device management compared, plus what to check before migrating, starting with who controls your domain's DNS.
The 3-2-1 Backup Rule (and 3-2-1-1-0) in Practice
The backup rule used worldwide, why ransomware added the extra "1" and "0", how to set RPO and RTO, a worked restore-time example, and how to make it work with Lao power…
Related solutions
Cloud & Digital Workplace
Send us a floor plan or a few photos of the site
We’ll come back with a few questions, then a first design. The first consultation is free, in Lao, Thai or English, on WhatsApp or our Facebook page.