机房建设

为老挝气候打造的机房:机柜、N+1 制冷、在线式 UPS、接地、气体灭火、门禁及告警传感器。

机房建设

现场常见问题

Plenty of servers live in a storeroom or under the accountant's desk: hot, dusty, unearthed, and open to the cleaner. The pattern we see again and again: the only air-conditioner fails in April, the room hits 40°C within the hour, and the switches and NAS shut themselves down. Sometimes the AC never comes back after a power cut because it has no auto-restart.

What a server room should have

System What we design
Racks & cabling 42U racks, cable management, both-end labels, front-to-back airflow
Cooling Two alternating (N+1) air-conditioners or precision cooling
Power Online double-conversion UPS, dual PDUs, earthing, surge protection
Security Card or face access, CCTV, an entry log
Fire Smoke detection and clean-agent gas suppression
Monitoring Temperature, humidity and water-leak sensors alerting via SMS/LINE/email

Heat and unsteady power

Two air-conditioners on a lead/lag controller that alternates them and starts the second unit when temperature climbs. Both must restart by themselves after a power cut. Many Vientiane buildings see voltage sag between 17:00 and 19:00 as load peaks; an online double-conversion UPS keeps the output steady throughout. We measure earth resistance on site rather than trusting the drawings.

Things that get missed

  • A gas-suppressed room has to be sealed, or the agent leaks out before the fire is out
  • No condensate or building water pipes over the racks
  • Mine-site rooms need dust filters and a cleaning schedule

Right-sized

From a single rack in an office to multi-rack rooms with raised floors or aisle containment.

Send us photos of the room and its dimensions on WhatsApp and we will tell you whether it can work and what needs to change.

功能

Redundant cooling

N+1 air-conditioning with a lead/lag controller and auto-restart after outages.

Clean power

Online UPS, surge protection and a measured earth.

Cabling & labeling

Tidy cabling, labels at both ends and patch documentation.

Environmental sensors

Temperature, humidity, water and smoke alerts before equipment shuts down.

Physical access control

Card or face access with CCTV on every entry.

Fire suppression

Early smoke detection and equipment-safe gas suppression.

设计与实施

  1. 1

    Site survey: space, floor loading, power, earthing and flood or leak risk.

  2. 2

    Calculate power (kW) and heat load (BTU/h) to size UPS and cooling.

  3. 3

    Design rack layout, cable pathways and airflow.

  4. 4

    Install power, cooling, racks, security and fire systems.

  5. 5

    Cut the mains and switch off one AC for real, then hand over documentation.

适用场景

  • A head office moving into a new building in Vientiane.
  • A dusty mine-site server room that needs sealing and filtration.
  • Hotels and hospitals that run 24/7.
  • School or ministry IT rooms being brought up to standard.

常见系统规模

Micro

适用于: Single rack in an office

  • Enclosed, locked rack with fans
  • Online UPS and PDU
  • Temperature sensor
获取报价

Standard

适用于: 2–4 racks, dedicated room

  • N+1 cooling with lead/lag controller
  • Access control and CCTV
  • Full sensor suite and alerting
获取报价

Enterprise

适用于: 5+ racks or a small data hall

  • Precision cooling and containment
  • Modular UPS and gas suppression
  • DCIM and MA contract
获取报价

我们供货并安装的品牌

所有品牌名称和商标归其各自所有者所有。除非另有明确说明,提及某品牌并不代表与其存在合作关系。产品均通过正规分销渠道采购。

常见问题

What temperature should a server room run at?

ASHRAE recommends equipment inlet air of about 18–27°C. There is no need to run the AC at 16°C; what matters is stability and a standby unit.

Can we use ordinary split air-conditioners?

For small rooms, yes: two units, a lead/lag controller and auto-restart after power returns. Comfort units are not designed for 24-hour duty, so they need more frequent cleaning and checks. Larger rooms should use precision cooling.

Why not water sprinklers in the server room?

Water ruins every device in the room, even for a small fire. Clean-agent gas puts the fire out without damage, but the room must be sealed and the design has to fit the building's fire protection. Where the building already has sprinklers throughout, a pre-action system is the usual compromise.

相关指南

相关计算工具

相关解决方案

数据中心与服务器

发给我们建筑平面图或几张现场照片

我们会先询问一些细节,再给出初步设计方案。首次咨询免费,可用老挝语、泰语或英语,通过 WhatsApp 或 Facebook 主页联系。